Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 4, 2019, 06:57 PM
  • D 0088_D 0087_442019_115941.mp4

Date
04/04/2019
W/O
0763051
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00155
PipeID
P09988
Time
11:57 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7955
Sewer Name
D JOINT OUTFALL D - UNIT 5
City
TORRANCE
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
20
Purpose
Capital Improvement Program Assesment
Project
20190404DF_JOINT_OUTFALL_D_UNIT_5
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
D 0088
Downstream MH
D 0087
Dir. of Survey
Downstream
Length Surveyed
482.9 ft.
Total Length
482.9 ft.
Structural Index
3
Structural Quick
5132
Structural Rating
13
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole D 0088 to D 0087
MH: D 0088MH: D 0087downstream0 ft. AMH - Upstream Manhole, Survey Begins - 11:57 AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start164.3 ft. MGP - General Photograph257.1 ft. MGP - General Photograph420.1 ft. MGP - General Photograph474.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish474.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish474.1 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 65% MAG474.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish474.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish482.9 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)482.9 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach482.9 ft. AMH - Downstream Manhole, Survey Ends - 12:19 PM

Observation photos (9)

  • Water Mark, 20 %of cross sectional area

    0 ft. - Water Mark, 20 %of cross sectional area

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    164.3 ft. - General Photograph

  • General Photograph

    257.1 ft. - General Photograph

  • General Photograph

    420.1 ft. - General Photograph

Observations (19)

DistanceCodeObservation
482.9MGOGREASE THROUGHOUT THE REACH (5%)
482.9MGOPeeling & Flaking Throughout The Reach
0AMH11:57 AM
482.9AMH12:19 PM
2SRV
2SAV
474.1SRV
0MWM
474.1SSS
474.1SZ65% MAG
2SAP
474.1SAP
420.1MGP
164.3MGP
257.1MGP
2SZ65% MAG
2SSS
0MWL
474.1SAV

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-04-04T11:57:05-07:00
documentation
FRANKLIN, IGNACIO, CASTILLO, SHADLER
is_lateral_inspection
false