Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2019, 03:44 PM
  • 02 2240_02 2239_412019_085311.mp4

Date
04/01/2019
W/O
PENDING
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00253
PipeID
P04514
Time
8:44 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7950
Sewer Name
02 DOWNEY-BELLFLOWER DIVERSION RELIEF TRUNK
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
25
Purpose
Routine Assessment
Project
20190401SHO_DOWNEY_BELLFLOWER_DIVERSION_RELIEF_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
02 2240
Downstream MH
02 2239
Dir. of Survey
Downstream
Length Surveyed
393.7 ft.
Total Length
393.7 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 02 2240 to 02 2239
MH: 02 2240MH: 02 2239downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - MH 224026.6 ft. SSS - Surface Spalling, at 01 o'clock, within 8 inches of joint: NO393.7 ft. AMH - Downstream Manhole, Survey Ends - MH 2239

Observation photos (1)

  • Surface Spalling, at 01 o'clock, within 8 inches of joint: NO

    26.6 ft. - Surface Spalling, at 01 o'clock, within 8 inches of joint: NO

Observations (5)

DistanceCodeObservation
0MWL
393.7AMHMH 2239
0MWM
26.6SSS
0AMHMH 2240

Properties (5)

customer
LACSD
datetime
2019-04-01T08:44:21-07:00
documentation
OBREGON, YOUNG, CASTILLO, BRAR
is_lateral_inspection
false
year_laid
19860128