Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 29, 2019, 03:06 PM
  • A 1077_A JOINT_3292019_084524.mp4

Date
03/29/2019
W/O
0763421
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00335
PipeID
P09451
Time
8:06 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7950
Sewer Name
A JOINT OUTFALL A - UNIT 4
City
LONG BEACH
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
09
Purpose
Maintenance Related
Project
20190329DF_JOINT_OUTFALL_A_UNIT_4
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Upstream MH
A JOINT
Downstream MH
A 1077
Dir. of Survey
Upstream
Length Surveyed
2.2 ft.
Total Length
2.2 ft.
Structural Index
4
Structural Quick
5232
Structural Rating
18
O&M Index
5
O&M Quick
5141
O&M Rating
9
Overall Index
4
Overall Quick
Overall Rating
27
Pipe schematic from manhole A JOINT to A 1077
MH: A JOINTMH: A 1077upstream0 ft. MSA - Survey Abandoned - DEBRIS0 ft. LU - Alignment Up, 45 %0.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES0.1 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES0.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES0.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES0.2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES - 30% MAG0.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES2.2 ft. AMH - Downstream Manhole, Survey Begins - 8:30 AM2.2 ft. MWL - Water Level, 100 %of cross sectional area2.2 ft. MWM - Water Mark, 100 %of cross sectional area

Observation photos (7)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES - 30% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES - 30% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.1 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.1 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Alignment Up, 45 %

    2.2 ft. - Alignment Up, 45 %

Observations (11)

DistanceCodeObservation
2SAV
2.2MSADEBRIS
2.1SAP
2.2LU
2.1SRC
0AMH8:30 AM
2.1SRV
0MWL
2SZ30% MAG
2SSS
0MWM

Properties (6)

additional_info
SOUTH BARREL. VIEW OF THE UPLEG FROM THE D/S SIPHON
custom_field_two
5
customer
LACSD
datetime
2019-03-29T08:06:29-07:00
documentation
FRANKLIN, IGNACIO, RUVALCABA
is_lateral_inspection
false