A 0934_A 0212_3282019_094729.mp4
0 ft. - Upstream Manhole, Survey Begins - 9:01 AM
0.1 ft. - Water Mark, 100 %of cross sectional area
0.1 ft. - Water Level, 100 %of cross sectional area
2 ft. - Alignment Down, 45 %
2 ft. - Lining Failure Blistered, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
66 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
66.1 ft. - Lining Failure Blistered, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
68 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
79 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 0.1 | MWM | — |
| 0.1 | MWL | — |
| 2 | LD | — |
| 79 | MGP | — |
| 68 | SAP | — |
| 66 | SAV | — |
| 0 | AMH | 9:01 AM |
| 79 | SAP | — |
| 79.4 | MSA | HIGH WATER |
| 2 | LFB | — |
| 66.1 | LFB | — |
| 79 | SAV | — |