Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 26, 2019, 03:46 PM
  • Section#1_G 0083_G 0082__3262019__I0126.mp4

Date
03/26/2019
W/O
0759064
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00347
PipeID
P10446
Time
8:46 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0126
Sewer Name
G JOINT OUTFALL G - UNIT 7
City
COMPTON
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
05
Purpose
Routine Assessment
Project
20190326SHO_JOINT_OUTFALL_G_UNIT_7
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
G 0083
Downstream MH
G 0082
Dir. of Survey
Downstream
Length Surveyed
676.5 ft.
Total Length
676.5 ft.
Structural Index
3
Structural Quick
3Y2Y
Structural Rating
660
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
660
Pipe schematic from manhole G 0083 to G 0082
MH: G 0083MH: G 0082downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - G 00830 ft. MWL - Water Level, 35 %of cross sectional area13 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT13 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT73.2 ft. MGO - General Observation - MAG COAT 50% THROUGHOUT675.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish675.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish676.5 ft. AMH - Downstream Manhole, Survey Ends - G 0082

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT

    13 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT

    13 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY THROUGHOUT

  • General Observation - MAG COAT 50% THROUGHOUT

    73.2 ft. - General Observation - MAG COAT 50% THROUGHOUT

Observations (9)

DistanceCodeObservation
676.5AMHG 0082
0MWM
0AMHG 0083
0MWL
13SAPSPORADICALLY THROUGHOUT
675.3SSS
13SSSSPORADICALLY THROUGHOUT
73.2MGOMAG COAT 50% THROUGHOUT
675.3SAP

Properties (6)

custom_field_three
PROJECTING AGGREGATE SPORADICALLY THROUGHOUT
custom_field_two
3
customer
LACSD
datetime
2019-03-26T08:46:46-07:00
documentation
OBREGON, YOUNG, SHADLER, BRAR, RUVALCABA
is_lateral_inspection
false