Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 15, 2019, 04:28 PM
  • 30 0124_30 0123_3152019_094724.mp4

Date
03/15/2019
W/O
0760336
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17828
Time
9:28 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7942
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
06
Purpose
Capital Improvement Program Assesment
Project
20190315DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
30 0124
Downstream MH
30 0123
Dir. of Survey
Downstream
Length Surveyed
376.3 ft.
Total Length
376.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 30 0124 to 30 0123
MH: 30 0124MH: 30 0123downstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:32 AM0.1 ft. MWM - Water Mark, 30 %of cross sectional area0.1 ft. MWL - Water Level, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start36.5 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 80% MAG36.5 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 45% MAG184.7 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach306.7 ft. MGP - General Photograph374.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish374.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish374.1 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 75% MAG376.3 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach376.3 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)376.3 ft. AMH - Downstream Manhole, Survey Ends - 10:08 AM

Observation photos (6)

  • Water Mark, 30 %of cross sectional area

    0.1 ft. - Water Mark, 30 %of cross sectional area

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 45% MAG

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 80% MAG

    36.5 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 80% MAG

  • General Observation - Peeling & Flaking Throughout The Reach

    184.7 ft. - General Observation - Peeling & Flaking Throughout The Reach

  • General Photograph

    306.7 ft. - General Photograph

Observations (16)

DistanceCodeObservation
2SSS
374.1SSS
374.1CM
376.3MGOPeeling & Flaking Throughout The Reach
374.1SZ75% MAG
0.1MWM
2SZ45% MAG
36.5SZ80% MAG
376.3MGOGREASE THROUGHOUT THE REACH (5%)
306.7MGP
2CM
0.1MWL
0AMH9:32 AM
184.7MGOPeeling & Flaking Throughout The Reach
36.5SZ45% MAG
376.3AMH10:08 AM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-03-15T09:28:28-07:00
documentation
FRANKLIN, IGNACIO, RUVALCABA
is_lateral_inspection
false