Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2019, 07:53 AM
  • H 0887_H 0616_02282019_235345.mp4

Date
02/28/2019
W/O
750842
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00191
PipeID
P11035
Time
11:53 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6412
Sewer Name
H JOINT OUTFALL H - UNIT 8H
City
BALDWIN PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_750842_TV15237_FEB2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
H 0616
Downstream MH
H 0887
Dir. of Survey
Upstream
Length Surveyed
390.3 ft.
Total Length
390.3 ft.
Structural Index
3
Structural Quick
5A3U
Structural Rating
487
O&M Index
3
O&M Quick
3N2N
O&M Rating
385
Overall Index
3
Overall Quick
Overall Rating
872
Pipe schematic from manhole H 0616 to H 0887
MH: H 0616MH: H 0887upstream0 ft. AMH - Upstream Manhole, Survey Ends - H 08872.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.8 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish2.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish3.2 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish7.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"31.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"55.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"58.7 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start80.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"101.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"125.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"175 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"177.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start198.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"223.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"245.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start245.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"270.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"294.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"318.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"342.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"375.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"388.3 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - DEBRIS/SLUDGE.388.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start388.3 ft. MGO - General Observation - MAG COATING THROUGHOUT 60%388.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start390.3 ft. MWL - Water Level, 20 %of cross sectional area390.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK390.3 ft. MWM - Water Mark, 25 %of cross sectional area390.3 ft. AMH - Downstream Manhole, Survey Begins - H 0616

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT 60%

    2 ft. - General Observation - MAG COATING THROUGHOUT 60%

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    145.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    212.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    331.6 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (33)

DistanceCodeObservation
2DSZDEBRIS/SLUDGE.
387.5SAV
119.7TFC
14.9TFC
335.1TFA
145.1SSS
264.6TFC
310.1TFC
0MWL
2DAGS
331.6SRV
288.7TFC
95.6TFC
215.3TFC
47.6TFC
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWM
167TFC
191.5TFC
390.3AMHH 0887
387.5SRV
358.9TFC
2MGOMAG COATING THROUGHOUT 60%
387.5SSS
212.6SAP
71.8TFC
2SAV
387.5SAP
387.5DAGS
144.4TFC
387.1DSZ
0AMHH 0616
382.7TFC

Properties (6)

additional_info
SC365928
custom_field_two
2
customer
LACSD
datetime
2019-02-28T23:53:23-08:00
documentation
PRO PIPE
is_lateral_inspection
false