Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2019, 07:11 AM
  • 14 0473_14 0472 _03082019_002802.mp4

Date
03/07/2019
W/O
750756
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00580
PipeID
P18562
Time
11:11 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6420
Sewer Name
14 TRUNK "D"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_750756_TV14023_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
14 0473
Downstream MH
14 0472
Dir. of Survey
Downstream
Length Surveyed
326.4 ft.
Total Length
326.4 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
325
O&M Index
2
O&M Quick
2L00
O&M Rating
130
Overall Index
2
Overall Quick
Overall Rating
455
Pipe schematic from manhole 14 0473 to 14 0472
MH: 14 0473MH: 14 0472downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 04730 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start19.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"43.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"90.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"114.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"137.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"161.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"185.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"190.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"237.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"265.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"289.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"324.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish326.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0472326.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
2SSS
265.3TFA
2SAP
19.1TFC
185.6TFC
190.3TFA
137.7TFC
161.7TFC
2DAGS
237.5TFC
326.4AMH14 0472
326.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
289.4TFC
114.8TFA
0AMH14 0473
0MWL
43.2TFA
90.7TFC
324.7SAP
0MWM
324.7SSS
324.7DAGS

Properties (6)

additional_info
S. LOPEZ
custom_field_two
2
customer
LACSD
datetime
2019-03-07T23:11:25-08:00
documentation
PRO PIPE
is_lateral_inspection
false