Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 7, 2019, 10:50 AM
  • 14 0466_14 0465 _03072019_040503.mp4

Date
03/07/2019
W/O
750756
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00580
PipeID
P18555
Time
2:50 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6419
Sewer Name
14 TRUNK "D"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_750756_TV14023_FEB2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0465
Downstream MH
14 0466
Dir. of Survey
Upstream
Length Surveyed
264.1 ft.
Total Length
264.1 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
2
O&M Quick
5141
O&M Rating
113
Overall Index
2
Overall Quick
Overall Rating
373
Pipe schematic from manhole 14 0465 to 14 0466
MH: 14 0465MH: 14 0466upstream0 ft. MSA - Survey Abandoned - REVERSAL COMPLETE.0 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish0 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0.8 ft. OBZ - Obstacles Other, 60 %of cross sectional area, from 04 to 11 o'clock - DEBRIS/OBSTRUCTION36.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"109.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"186.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"247.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"262.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start262.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start262.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start264.1 ft. MWL - Water Level, 30 %of cross sectional area264.1 ft. AMH - Downstream Manhole, Survey Begins - 14 0465264.1 ft. MWM - Water Mark, 60 %of cross sectional area

Observation photos (5)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Other, 60 %of cross sectional area, from 04 to 11 o'clock - DEBRIS/OBSTRUCTION

    263.3 ft. - Obstacles Other, 60 %of cross sectional area, from 04 to 11 o'clock - DEBRIS/OBSTRUCTION

  • Survey Abandoned - REVERSAL COMPLETE.

    264.1 ft. - Survey Abandoned - REVERSAL COMPLETE.

Observations (15)

DistanceCodeObservation
2SAP
227.2TFC
154.3TFC
16.8TF
264.1MSAREVERSAL COMPLETE.
264.1SSS
264.1DAGS
77.2TFC
263.3OBZDEBRIS/OBSTRUCTION
264.1SAP
2DAGS
2SSS
0MWL
0AMH14 0465
0MWM

Properties (6)

additional_info
SC365935
custom_field_two
2
customer
LACSD
datetime
2019-03-07T02:50:32-08:00
documentation
PRO PIPE
is_lateral_inspection
false