A 0375_A 0374_4252019_014814.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
9.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
9.8 ft. - General Observation - 30%% MAG COAT START
13.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
15.8 ft. - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
34 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
59.2 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
67.3 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
80.8 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
89.8 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
162.1 ft. - Surface Reinforcement Corroded, from 12 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
168.5 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
174.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
232.6 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
288.6 ft. - General Observation - 95% MAG COAT START
368.8 ft. - Material Change, Vitrified clay pipe - START
384.9 ft. - General Observation - THIN LAYER OF COATING ON VCP
388.5 ft. - General Observation - LINE APPEARS AS VCP PIPE
490.2 ft. - Material Change, Vitrified clay pipe - FINISH
490.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
547.4 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 15.8 | SAP | SEVERE AGG |
| 288.6 | MGO | 95% MAG COAT START |
| 547.4 | SRC | CIRCUM REBAR |
| 34 | SRC | CIRCUM REBAR |
| 0 | MWL | — |
| 490.2 | MMC | FINISH |
| 704.3 | SAP | SEVERE AGG PROJECTING |
| 168.5 | SRC | CIRCUM REBAR |
| 174.8 | SSS | PEELING CONCRETE |
| 62.4 | SRC | CIRCUM REBAR |
| 704.3 | MGO | 95% MAG COAT FINISH |
| 80.8 | SRC | CIRCUM REBAR |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 9.8 | SSS | PEELING CONCRETE |
| 67.3 | SRC | CIRCUM REBAR |
| 59.2 | SRC | CIRCUM REBAR |
| 704.3 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 13.4 | SAP | SEVERE AGG |
| 65.5 | MGO | 30% MAG COAT FINISH |
| 0 | AMH | 1:55AM |
| 162.1 | SRC | CIRCUM REBAR |
| 0 | MWM | — |
| 490.2 | SAP | SEVERE AGG |
| 704.8 | AMH | 3:10AM |
| 232.6 | SRC | CIRCUM REBAR |
| 368.8 | MMC | START |
| 384.9 | MGO | THIN LAYER OF COATING ON VCP |
| 9.8 | MGO | 30%% MAG COAT START |
| 388.5 | MGO | LINE APPEARS AS VCP PIPE |
| 89.8 | SRC | CIRCUM REBAR |