Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 24, 2019, 11:14 AM
  • 15 0376_15 0375_4242019_041854.mp4

Date
04/24/2019
W/O
0766292
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00325
PipeID
P08286
Time
4:14 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1186
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
ROSEMEAD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Capital Improvement Program Assesment
Project
20190424MDM_JOA_1A_SAN_JOSE_CREEK_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
15 0376
Downstream MH
15 0375
Dir. of Survey
Downstream
Length Surveyed
374.9 ft.
Total Length
374.9 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 15 0376 to 15 0375
MH: 15 0376MH: 15 0375downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:15AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT2 ft. MGO - General Observation - 95% MAG COAT START37.5 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC134 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE215 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC374.3 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC374.3 ft. MGO - General Observation - 95% MAG COAT FINISH374.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE UNDER MAG COAT374.9 ft. AMH - Downstream Manhole, Survey Ends - 4:45AM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT

  • General Observation - 95% MAG COAT START

    2 ft. - General Observation - 95% MAG COAT START

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    37.5 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    134 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    215 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

Observations (12)

DistanceCodeObservation
2SSSBLISTERING PEELING CONCRETE UNDER MAG COAT
0MWM
374.9AMH4:45AM
374.3SAVSEVERE AGG SPORATIC
374.3MGO95% MAG COAT FINISH
215SAVSEVERE AGG SPORATIC
0AMH4:15AM
134SSSPEELING CONCRETE
37.5SAVSEVERE AGG SPORATIC
0MWL
2MGO95% MAG COAT START
374.3SSSBLISTERING PEELING CONCRETE UNDER MAG COAT

Properties (6)

custom_field_three
SEVERE AGG VISIBLE-95% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2019-04-24T04:14:29-07:00
documentation
MARTIN,REVELES,OLIVER 111,RUVALCABA
is_lateral_inspection
false