- Date
- 04/09/2019
- W/O
- 0765242
- Weather
- Dry
- Operator/Surveyor
- SANTIAGO OBREGON
- Sewer ID
- Z00635
- PipeID
- P25907
- Time
- 9:43 AM
- Certificate
- U-1014-06022541
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- G7960
- Sewer Name
- 15 TYLER AVENUE RELIEF TRUNK
- City
- EL MONTE
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 15
- Page No.
- 23
- Purpose
- Routine Assessment
- Project
- 20190409SHO_TYLER_AVENUE_RELIEF_TRUNK
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 24 in.
- Upstream MH
- 15 1161
- Downstream MH
- 15 0951
- Dir. of Survey
- Downstream
- Length Surveyed
- 99.6 ft.
- Total Length
- 99.6 ft.
- Structural Index
- 2
- Structural Quick
- 2100
- Structural Rating
- 2
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 2
Pipe schematic from manhole 15 1161 to 15 0951 Observation photos (1)

7.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - DISCOLORATION