Section#8_05 2086_05 2085__4152019__I0132.mp4
2 ft. - General Observation - 95% MAG COAT START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
359.2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
646.5 ft. - Surface Aggregate Projecting, from 02 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 668.4 | MGO | 95% MAG COAT |
| 646.5 | SAP | SEVERE AGG |
| 359.2 | SAP | SEVERE AGG |
| 668.4 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 668.4 | DAGS | — |
| 2 | MGO | 95% MAG COAT START |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 668.4 | SAP | SEVERE AGG |
| 2 | SAP | SEVERE AGG |
| 2.4 | DAGS | — |
| 668.8 | AMH | 5:25AM |
| 0 | MWL | — |
| 0 | AMH | 4:35AM |
| 27.8 | SAV | SEVERE AGG |