Section#6_05 2089_05 2088__4122019__I0130.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - General Observation - 95% MAG COAT START
41.5 ft. - Surface Aggregate Projecting, from 11 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG
66.1 ft. - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
129.1 ft. - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AG
243.8 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE VISIBLE SEVERE AGG
412.9 ft. - Surface Aggregate Projecting, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG
577.6 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG
612.8 ft. - Surface Aggregate Projecting, from 01 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 578 | MGO | 90% MAG COAT START |
| 2 | SAP | SEVERE AGG |
| 612.8 | SAP | SEVERE AGG |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 412.9 | SAP | SEVERE AGG |
| 645.8 | AMH | 5:10AM |
| 0 | MWL | — |
| 0 | AMH | 4:30AM |
| 645.3 | SAP | SEVERE AGG |
| 645.3 | MGO | 90% MAG COAT FINISH |
| 577.6 | SAP | SEVERE AGG |
| 129.1 | SAP | SEVERE AG |
| 0 | MWM | — |
| 66.1 | SAP | SEVERE AGG |
| 41.5 | SAP | SEVERE AGG |
| 2 | DAGS | — |
| 645.3 | SSS | BLISTERING PEELING CONCRETE |
| 645.3 | DAGS | — |
| 2 | MGO | 95% MAG COAT START |
| 243.8 | SSS | BLISTERING CONCRETE VISIBLE SEVERE AGG |