Wastewater/Activity/PacpInspection/1.0Mar 19, 2019, 06:17 AM
  • 20 0061_20 0060_03182019_232740.mp4

Date
03/18/2019
W/O
756628
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00742
PipeID
P18982
Time
11:17 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6430
Sewer Name
20 TRUNK "A"
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
02
Purpose
Routine Assessment
Project
WO_756628_TV20026_MAR2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
20 0061
Downstream MH
20 0060
Dir. of Survey
Downstream
Length Surveyed
372.2 ft.
Total Length
372.2 ft.
Structural Index
3
Structural Quick
3N00
Structural Rating
222
O&M Index
2
O&M Quick
2N00
O&M Rating
148
Overall Index
3
Overall Quick
Overall Rating
370
Pipe schematic from manhole 20 0061 to 20 0060
MH: 20 0061MH: 20 0060downstream0 ft. AMH - Upstream Manhole, Survey Begins - 20 00610 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT 75%69.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"269.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"370.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish370.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish372.2 ft. AMH - Downstream Manhole, Survey Ends - 20 0060

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT 75%

    2 ft. - General Observation - MAG COATING THROUGHOUT 75%

Observations (11)

DistanceCodeObservation
2DAGS
0AMH20 0061
372.2AMH20 0060
370.5DAGS
2SAV
0MWM
2MGOMAG COATING THROUGHOUT 75%
69.2TFC
269.3TFC
370.5SAV
0MWL

Properties (6)

additional_info
SC365948
custom_field_two
2
customer
LACSD
datetime
2019-03-18T23:17:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false