Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 22, 2019, 04:49 PM
  • 18 0011_18 0010_4222019_095221.mp4

Date
04/22/2019
W/O
0767071
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00713
PipeID
P13827
Time
9:49 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7967
Sewer Name
18 WALNUT WAY TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
15
Purpose
Capital Improvement Program Assesment
Project
20190418DF_WALNUT_WAY_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
18 0011
Downstream MH
18 0010
Dir. of Survey
Downstream
Length Surveyed
220.9 ft.
Total Length
220.9 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 18 0011 to 18 0010
MH: 18 0011MH: 18 0010downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 9:50 AM2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 90% MAG8 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4", 4" - Open48.3 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 4" - Open51.1 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open56.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"111.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - Open115.3 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open161 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open171.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"196.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"217.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish217.6 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 90% MAG217.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish220.9 ft. MGO - General Observation - ROACHES @ MH220.9 ft. AMH - Downstream Manhole, Survey Ends - 10:09 AM220.9 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. STUB

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 90% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 90% MAG

Observations (22)

DistanceCodeObservation
8TFOpen
217.6CM
217.6SZ90% MAG
111.2TFOpen
0MWM
48.3TFOpen
0MWL
220.9MGOROACHES @ MH
171.8TFC
0MGOROACHES @ MH
51.1TFOpen
217.6SAV
220.9AMH10:09 AM
161TFOpen
2SAV
115.3TFOpen
220.9MGOConn. @ Mh, 3 O' Clock. STUB
0AMH9:50 AM
56.4TFC
2CM
2SZ90% MAG
196.6TFC

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2019-04-22T09:49:03-07:00
documentation
FRANKLIN, CASTILLO, IGNACIO
is_lateral_inspection
false