Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 18, 2019, 04:42 PM
  • 15 0151_15 0150_4182019_094647.mp4

Date
04/18/2019
W/O
0765241
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00635
PipeID
P12052
Time
9:42 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7964
Sewer Name
15 TYLER AVENUE RELIEF TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Capital Improvement Program Assesment
Project
20190418DF_TYLER_AVENUE_RELIEF_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
15 0151
Downstream MH
15 0150
Dir. of Survey
Downstream
Length Surveyed
167 ft.
Total Length
167 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 15 0151 to 15 0150
MH: 15 0151MH: 15 0150downstream0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:43 AM0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start116.2 ft. MGP - General Photograph163.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish163.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish163.9 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG166.8 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)166.8 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active166.8 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach167 ft. AMH - Downstream Manhole, Survey Ends - 10:00 AM167 ft. MGO - General Observation - ROACHES @ MH

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG

  • General Photograph

    116.2 ft. - General Photograph

Observations (16)

DistanceCodeObservation
0MGOConn. @ Mh, 9 O' Clock. OPEN
167AMH10:00 AM
163.9SAV
166.8MGOGREASE THROUGHOUT THE REACH (5%)
166.8MGOConn. @ Mh, 3 O' Clock. Active
0MWL
2SSS
167MGOROACHES @ MH
163.9SSS
2SZ60% MAG
0AMH9:43 AM
163.9SZ70% MAG
166.8MGOPeeling & Flaking Throughout The Reach
0MWM
2SAV
116.2MGP

Properties (6)

additional_info
PIPE SIZE IS 30", NOT 24"
custom_field_two
3
customer
LACSD
datetime
2019-04-18T09:42:03-07:00
documentation
FRANKLIN, CASTILLO, SHADLER
is_lateral_inspection
false