Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 2, 2019, 08:58 AM
  • 32 1239_32 1238 _04022019_030522.mp4

Date
04/02/2019
W/O
756114
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00832
PipeID
P19708
Time
1:58 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6443
Sewer Name
32 BOUQUET CANYON TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
07
Purpose
Routine Assessment
Project
WO_756114_TV32007_MAR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
32 1239
Downstream MH
32 1238
Dir. of Survey
Downstream
Length Surveyed
401.1 ft.
Total Length
401.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2O11
O&M Rating
157
Overall Index
2
Overall Quick
Overall Rating
157
Pipe schematic from manhole 32 1239 to 32 1238
MH: 32 1239MH: 32 1238downstream0 ft. MGO - General Observation - RUN LIST STATES NRCP. MATERIAL IS VCP. SECTION INFO CHANGED TO REFLECT ACTUAL PIPE MATERIAL.0 ft. AMH - Upstream Manhole, Survey Begins - 32 12390 ft. MWL - Water Level, 5 %of cross sectional area11.2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Start69.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"150.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"224.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"227.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"232.6 ft. RFJ - Roots Fine Joint, from 04 to 08 o'clock, within 8 inches of joint: YESR301.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"375.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"377.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"399.3 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Finish401.1 ft. AMH - Downstream Manhole, Survey Ends - 32 1238

Observation photos (2)

  • Deposits Attached Other, 5 %of cross sectional area, from 12 to 12 o'clock,  , within 8 inches of joint: YES, Start

    11.2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 12 to 12 o'clock, , within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 04 to 08 o'clock, within 8 inches of joint: YESR

    232.6 ft. - Roots Fine Joint, from 04 to 08 o'clock, within 8 inches of joint: YESR

Observations (14)

DistanceCodeObservation
401.1AMH32 1238
11.2DAZ
232.6RFJ
0MGORUN LIST STATES NRCP. MATERIAL IS VCP. SECTION INFO CHANGED TO REFLECT ACTUAL PIPE MATERIAL.
399.3DAZ
0AMH32 1239
69.6TFC
375.1TFC
0MWL
224.3TFC
227.2TFC
377.8TFC
150.7TFC
301.3TFC

Properties (6)

additional_info
SC366211
custom_field_two
4
customer
LACSD
datetime
2019-04-02T01:58:39-07:00
documentation
PRO PIPE
is_lateral_inspection
false