B 0347_B 0346_04092019_031804.mp4
2.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
4.3 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
4.3 ft. - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start - MAG COATING
176.7 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
236.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES
261.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
318.8 ft. - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH
| Distance | Code | Observation |
|---|---|---|
| 176.7 | SAV | — |
| 315.4 | DAGS | — |
| 318.8 | AMH | B 0346 |
| 261.1 | SAV | — |
| 315.4 | SAP | — |
| 4.3 | SRI | — |
| 0 | MWL | — |
| 236.6 | SAP | — |
| 0 | MWM | — |
| 0 | AMH | B 0347 |
| 318.8 | MGO | SERVICE CONNECTION AT 3 O' CLOCK AT MH |
| 176.5 | SRI | — |
| 315.4 | SSS | — |
| 2.5 | DAGS | — |
| 315.4 | DAZ | — |
| 236.4 | TB | — |
| 2.5 | MGO | SPLASHING DUE TO HEAVY FLOW |
| 0 | MGO | SERVICE CONNECTION AT 3 O' CLOCK AT MH |
| 261.1 | SAP | — |
| 76.4 | SSS | — |
| 4.3 | DAZ | MAG COATING |