Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 1, 2019, 11:17 AM
  • 32 1245_32 1244 _04012019_042326.mp4

Date
04/01/2019
W/O
755773
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00832
PipeID
P19713
Time
4:17 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6441
Sewer Name
32 BOUQUET CANYON TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
07
Purpose
Routine Assessment
Project
WO_755773_TV32008_MAR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
32 1245
Downstream MH
32 1244
Dir. of Survey
Downstream
Length Surveyed
49.8 ft.
Total Length
49.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2A00
O&M Rating
20
Overall Index
2
Overall Quick
Overall Rating
20
Pipe schematic from manhole 32 1245 to 32 1244
MH: 32 1245MH: 32 1244downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 12450 ft. MWL - Water Level, 5 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start49.8 ft. AMH - Downstream Manhole, Survey Ends - 32 124449.8 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK49.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWM
0AMH32 1245
49.8AMH32 1244
2DAGS
0MWL
49.8MGOACTIVE CONNECTION AT MH 3 O'CLOCK
49.8DAGS

Properties (6)

additional_info
SC366209
custom_field_two
2
customer
LACSD
datetime
2019-04-01T04:17:53-07:00
documentation
PRO PIPE
is_lateral_inspection
false