A 0374_A 0373_4262019_015013.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - 95% MAG COAT START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BGLISTERING PEELING CONCRETE UNDER MAG COAT
60.4 ft. - General Observation - 25% MAG COAT START
60.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
89.4 ft. - Water Level, 30 %of cross sectional area
123.7 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG
137.5 ft. - Water Mark, 80 %of cross sectional area
149.6 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - POSSIBLE DBREIE UNDER FLOW
161.2 ft. - Water Mark, 20 %of cross sectional area
164 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
166.6 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: NO - LONG & CIRCUM REBAR
327.3 ft. - Surface Reinforcement Corroded, from 12 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
365.8 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
484.3 ft. - General Photograph - 80% MAG COAT START
| Distance | Code | Observation |
|---|---|---|
| 550.9 | AMH | 2:45AM |
| 164 | SAP | SEVERE AGG |
| 550.2 | MGO | 80% MAG COAT FINISH |
| 137.5 | MWL | — |
| 0 | AMH | 1:50AM |
| 186.6 | MGO | 30% MAG COAT START |
| 0 | MWM | — |
| 2 | SAP | SEVERE AGG |
| 89.4 | MWL | — |
| 137.5 | MWM | — |
| 123.7 | SAP | SEVERE AGG |
| 484.3 | MGP | 80% MAG COAT START |
| 327.3 | SRC | CIRCUM REBAR |
| 2 | MGO | 95% MAG COAT START |
| 550.2 | SSS | BLISTERING PEELING CONCRETE |
| 161.2 | MWM | — |
| 149.6 | DSZ | POSSIBLE DBREIE UNDER FLOW |
| 0 | MWL | — |
| 60.5 | SSS | PEELING CONCRETE |
| 365.8 | SAP | SEVERE AGG |
| 161.2 | MWL | — |
| 2 | SSS | BGLISTERING PEELING CONCRETE UNDER MAG COAT |
| 166.6 | SRC | LONG & CIRCUM REBAR |
| 60.4 | MGO | 25% MAG COAT START |
| 32.6 | MGO | 80% MAG COAT START |
| 550.2 | SAP | SEVERE AGG |