Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 22, 2019, 09:03 AM
  • 18 0442_18 0441_4222019_030918.mp4

Date
04/22/2019
W/O
0767446
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00675
PipeID
P14293
Time
2:03 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1185
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
20190422MDM_FLORENCE_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
18 0441
Downstream MH
18 0442
Dir. of Survey
Upstream
Length Surveyed
287.2 ft.
Total Length
287.2 ft.
Structural Index
3
Structural Quick
3625
Structural Rating
28
O&M Index
4
O&M Quick
4321
O&M Rating
14
Overall Index
3
Overall Quick
Overall Rating
42
Pipe schematic from manhole 18 0441 to 18 0442
MH: 18 0441MH: 18 0442upstream0 ft. MSA - Survey Abandoned - 30% GRASE & SLUDGE0.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG0.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE0.4 ft. DAGS - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 08 o'clock, , within 8 inches of joint: NO - GREASE & SLUDGE0.4 ft. SAP - Surface Aggregate Projecting, from 08 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG1.2 ft. SAP - Surface Aggregate Projecting, from 08 to 11 o'clock, within 8 inches of joint: YES, Finish9.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped17 ft. DAGS - Deposits Attached Grease, 30 %of cross sectional area, from 02 to 08 o'clock, , within 8 inches of joint: YES - GREASE & SLUDGE22.1 ft. DAGS - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 08 o'clock, , within 8 inches of joint: YES, Start - GREASE & SLUDGE35.5 ft. SSS - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: YES - PEELING CONCRETE37 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped60.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped85.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open109 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped133 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open161.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped173.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG185.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped192.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE205.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE207.7 ft. MGO - General Observation - 70% MAG COAT FINISH209.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped237.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped251.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES, Finish261.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped271.5 ft. SSS - Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE275.9 ft. SAP - Surface Aggregate Projecting, from 08 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG279.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES, Start279.2 ft. SAP - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG285.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG285.2 ft. MGO - General Observation - 70% MAG COAT START285.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETECONCRETE287.2 ft. MWL - Water Level, 5 %of cross sectional area287.2 ft. AMH - Upstream Manhole, Survey Begins - 3:15AM287.2 ft. SAP - Surface Aggregate Projecting, from 08 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG287.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active287.2 ft.287.2 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (15)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - 70% MAG COAT START

    2 ft. - General Observation - 70% MAG COAT START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETECONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETECONCRETE

  • Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG

    8 ft. - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 04 o'clock,  , within 8 inches of joint: YES, Start

    8.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

    11.3 ft. - Surface Aggregate Projecting, from 08 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    15.7 ft. - Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • General Observation - 70% MAG COAT FINISH

    79.5 ft. - General Observation - 70% MAG COAT FINISH

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    81.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    95.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    113.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

    251.7 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

  • Deposits Attached Grease, 30 %of cross sectional area, from 03 to 08 o'clock,  , within 8 inches of joint: YES, Start - GREASE & SLUDGE

    265.1 ft. - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 08 o'clock, , within 8 inches of joint: YES, Start - GREASE & SLUDGE

  • Deposits Attached Grease, 30 %of cross sectional area, from 02 to 08 o'clock,  , within 8 inches of joint: YES - GREASE & SLUDGE

    270.2 ft. - Deposits Attached Grease, 30 %of cross sectional area, from 02 to 08 o'clock, , within 8 inches of joint: YES - GREASE & SLUDGE

  • Deposits Attached Grease, 30 %of cross sectional area, from 03 to 08 o'clock,  , within 8 inches of joint: NO - GREASE & SLUDGE

    286.8 ft. - Deposits Attached Grease, 30 %of cross sectional area, from 03 to 08 o'clock, , within 8 inches of joint: NO - GREASE & SLUDGE

Observations (38)

DistanceCodeObservation
154.2TFOpen
77.7TFCCapped
251.7SSSPEELING CONCRETE
8.1DAGS
286SAP
2SAPSEVERE AGG
0MWL
81.8SSSPEELING CONCRETE
277.8TFCCapped
15.7SSSPEELING CONCRETE
0AMH3:15AM
113.3SAPSEVERE AGG
287.2MSA30% GRASE & SLUDGE
36.1DAGS
286.8SAPSEVERE AGG
226.3TFCapped
0SAPSEVERE AGG
178.2TFCCapped
125.7TFCCapped
101.8TFCCapped
11.3SAPSEVERE AGG
286.8SSSBLISTERING PEELING CONCRETE
250.2TFCCapped
25.4TFCCapped
0MGOConn. @ Mh, 3 O' Clock. Active
2MGO70% MAG COAT START
265.1DAGSGREASE & SLUDGE
202TFOpen
286.8DAGSGREASE & SLUDGE
95.1SSSPEELING CONCRETE
286.8SAPSEVERE AGG
270.2DAGSGREASE & SLUDGE
8SAPSEVERE AGG
0
0MWM
49.3TFCCapped
79.5MGO70% MAG COAT FINISH
2SSSBLISTERING PEELING CONCRETECONCRETE

Properties (4)

customer
LACSD
datetime
2019-04-22T02:03:46-07:00
documentation
MARTIN,REVELES
is_lateral_inspection
false