Wastewater/Activity/PacpInspection/1.0Feb 26, 2019, 08:44 AM
  • 08 0471_08 0470_2262019_013603.mp4

Date
02/26/2019
W/O
0744161
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00026
PipeID
P00527
Time
12:44 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1128
Sewer Name
08 216TH STREET TRUNK
City
CARSON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20190226MDM_216TH_STREET_TRUNK
Material
RCP-CTL
Shape
Circular
Height
36 in.
Upstream MH
08 0471
Downstream MH
08 0470
Dir. of Survey
Downstream
Length Surveyed
470.7 ft.
Total Length
470.7 ft.
Structural Index
5
Structural Quick
5541
Structural Rating
29
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
5
Overall Quick
Overall Rating
33
Pipe schematic from manhole 08 0471 to 08 0470
MH: 08 0471MH: 08 0470downstream0 ft. MWL - Water Level, 80 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:45AM2 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR2 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MGO - General Observation - 100% MISSING TILES25.3 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BROKEN MISSING REBAR CORRISON BEYOUND REBAR34.5 ft. MGO - General Observation - 40% MISSING TILES START50.2 ft. MGO - General Observation - 100% MISSING TILES65.3 ft. MGO - General Observation - 30% MISSING TILES99.6 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR113.3 ft. MGO - General Observation - 100% MISSING TILES132.2 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR189.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open208.2 ft. MGO - General Observation - 2 ROWS TILES255.2 ft. SRC - Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: NO265.8 ft. MGO - General Observation - 5 ROWS TILES IN PLACE283.2 ft. MGO - General Observation - 2 ROWS TILES289 ft. MGO - General Observation - 20% MISSING TILES416 ft. MGO - General Observation - 90% MISSING TILES433.1 ft. MGO - General Observation - 3 ROWS TILES470.2 ft. MGO - General Observation - Conn. @ Mh, 12 O' Clock. Active470.2 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG470.2 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - BROKEN MISSING REBAR BCORRISON BEYOUND REBAR470.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN470.2 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - LONG & CIRCUM REBAR470.7 ft. AMH - Downstream Manhole, Survey Ends - 2:30AM

Observation photos (10)

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR

    2 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR

  • Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - 100% MISSING TILES

    2 ft. - General Observation - 100% MISSING TILES

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BROKEN MISSING REBAR CORRISON BEYOUND REBAR

    25.3 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BROKEN MISSING REBAR CORRISON BEYOUND REBAR

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR

    99.6 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR

  • General Observation - 100% MISSING TILES

    113.3 ft. - General Observation - 100% MISSING TILES

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR

    132.2 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - BROKEN REBAR

  • Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: NO

    255.2 ft. - Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: NO

  • General Observation - 20% MISSING TILES

    289 ft. - General Observation - 20% MISSING TILES

  • General Observation - 90% MISSING TILES

    416 ft. - General Observation - 90% MISSING TILES

Observations (27)

DistanceCodeObservation
34.5MGO40% MISSING TILES START
470.2MGOConn. @ Mh, 12 O' Clock. Active
470.2SAMSEVERE AGG
0MWL
283.2MGO2 ROWS TILES
289MGO20% MISSING TILES
2SRCLONG CIRCUM REBAR
0MWM
2SAMSEVERE AGG
25.3SRCBROKEN MISSING REBAR CORRISON BEYOUND REBAR
65.3MGO30% MISSING TILES
132.2SRCBROKEN REBAR
470.2SRCBROKEN MISSING REBAR BCORRISON BEYOUND REBAR
50.2MGO100% MISSING TILES
255.2SRC
470.2MGOConn. @ Mh, 9 O' Clock. OPEN
0AMH1:45AM
470.7AMH2:30AM
470.2SRCLONG & CIRCUM REBAR
265.8MGO5 ROWS TILES IN PLACE
2MGO100% MISSING TILES
208.2MGO2 ROWS TILES
416MGO90% MISSING TILES
189.4TFOpen
99.6SRCBROKEN REBAR
113.3MGO100% MISSING TILES
433.1MGO3 ROWS TILES

Properties (6)

custom_field_three
CORRISON BEYOUND REBAR
custom_field_two
1
customer
LACSD
datetime
2019-02-26T00:44:04-08:00
documentation
MARTIN,OLIVER 111,CASTILLO
is_lateral_inspection