Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 25, 2019, 11:05 AM
  • 08 0558_08 0557_2252019_031643.mp4

  • 08 0558_08 0557_2252019_033423.mp4

Date
02/25/2019
W/O
0755897
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00015
PipeID
P00143
Time
3:05 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1126
Sewer Name
08 MAIN STREET RELIEF TRUNK
City
CARSON
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
07
Purpose
Capital Improvement Program Assesment
Project
20190225MDM_MAIN_STREET_RELIEF_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
08 0558
Downstream MH
08 0557
Dir. of Survey
Downstream
Length Surveyed
554.9 ft.
Total Length
554.9 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
3
O&M Quick
4A3A
O&M Rating
99
Overall Index
3
Overall Quick
Overall Rating
105
Pipe schematic from manhole 08 0558 to 08 0557
MH: 08 0558MH: 08 0557downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:15AM0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. MGO - General Observation - MAG COAT 80% START46.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE52.6 ft. MGO - General Observation - MAG COAT 70% START92.6 ft. IR - Infiltration Runner, from 09 to 03 o'clock, within 8 inches of joint: YES92.6 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES108.5 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 03 o'clock, , within 8 inches of joint: YES108.5 ft. ID - Infiltration Dripper, from 12 to 03 o'clock, within 8 inches of joint: YES172.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE196.1 ft. IR - Infiltration Runner, from 09 to 03 o'clock, within 8 inches of joint: YES196.1 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES236.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 03 o'clock, , within 8 inches of joint: YES258.5 ft. IR - Infiltration Runner, from 09 to 03 o'clock, within 8 inches of joint: YES258.5 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES263.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active322.7 ft. IR - Infiltration Runner, from 09 to 03 o'clock, within 8 inches of joint: YES322.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES347 ft. IR - Infiltration Runner, from 09 to 03 o'clock, within 8 inches of joint: YES347 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES361.8 ft. MGO - General Observation - MAG G COAT 50% START370.9 ft. ID - Infiltration Dripper, from 09 to 03 o'clock, within 8 inches of joint: YES370.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES386.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES393.8 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES393.8 ft. IR - Infiltration Runner, from 09 to 03 o'clock, within 8 inches of joint: YES401.8 ft. IR - Infiltration Runner, from 09 to 03 o'clock, within 8 inches of joint: YES401.8 ft. DAE - Deposits Attached Encrustation, 20 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES417.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES417.5 ft. ID - Infiltration Dripper, from 09 to 03 o'clock, within 8 inches of joint: YES426 ft. ID - Infiltration Dripper, from 09 to 03 o'clock, within 8 inches of joint: YES441.3 ft. IR - Infiltration Runner, from 09 to 03 o'clock, within 8 inches of joint: YES449.6 ft. ID - Infiltration Dripper, from 09 to 03 o'clock, within 8 inches of joint: YES449.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES472.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES472.9 ft. ID - Infiltration Dripper, from 09 to 03 o'clock, within 8 inches of joint: YES496.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES496.9 ft. IR - Infiltration Runner, from 09 to 03 o'clock, within 8 inches of joint: YES503.9 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES503.9 ft. IR - Infiltration Runner, from 09 to 03 o'clock, within 8 inches of joint: YES534 ft. ID - Infiltration Dripper, from 09 to 03 o'clock, within 8 inches of joint: YES534 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES554.2 ft. MGO - General Observation - MAG COAT 50% FINISH554.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active554.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN STOPLOG IN PLACE554.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE554.9 ft. AMH - Downstream Manhole, Survey Ends - 4:15AM

Observation photos (13)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • General Observation - MAG COAT 80% START

    2 ft. - General Observation - MAG COAT 80% START

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    46.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • General Observation - MAG COAT 70% START

    52.6 ft. - General Observation - MAG COAT 70% START

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    92.6 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 03 o'clock,  , within 8 inches of joint: YES

    108.5 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 03 o'clock, , within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    172.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    196.1 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 03 o'clock,  , within 8 inches of joint: YES

    236.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    258.5 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

  • General Observation - MAG G COAT 50% START

    361.8 ft. - General Observation - MAG G COAT 50% START

  • Deposits Attached Encrustation, 20 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    401.8 ft. - Deposits Attached Encrustation, 20 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    503.9 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

Observations (49)

DistanceCodeObservation
554.9AMH4:15AM
534ID
108.5DAE
554.2MGOMAG COAT 50% FINISH
52.6MGOMAG COAT 70% START
0MWL
322.7IR
196.1IR
258.5IR
386.4DAE
417.5DAE
2SSSBLISTERING PEELING CONCRETE
92.6IR
196.1DAE
393.8DAE
2MGOMAG COAT 80% START
472.9DAE
46.6SSSBLISTERING PEELING CONCRETE
503.9DAE
92.6DAE
496.9DAE
449.6ID
236.4DAE
426ID
503.9IR
0AMH3:15AM
554.2MGOConn. @ Mh, 3 O' Clock. Active
172.5SSSPEELING CONCRETE
401.8IR
258.5DAE
0MWM
393.8IR
401.8DAE
534DAE
472.9ID
322.7DAE
361.8MGOMAG G COAT 50% START
496.9IR
370.9ID
347IR
554.2MGOConn. @ Mh, 9 O' Clock. OPEN STOPLOG IN PLACE
417.5ID
554.2SSSBLISTERING PEELING CONCRETE
370.9DAE
347DAE
263.3TFActive
108.5ID
441.3IR
449.6DAE

Properties (7)

custom_field_three
BLISTERING PEELING CONCRETE
custom_field_two
3
customer
LACSD
datetime
2019-02-25T03:05:38-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false
year_laid
19740709