Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 20, 2019, 08:56 AM
  • 02 0132_02 0131_2202019_030310.mp4

Date
02/20/2019
W/O
0756122
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00251
PipeID
P02433
Time
12:56 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1119
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
BELLFLOWER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Capital Improvement Program Assesment
Project
20190220MDM_DOWNEY_BELLFLOWER_TRUNK
Material
RCP-CTL
Shape
Circular
Height
33 in.
Upstream MH
02 0132
Downstream MH
02 0131
Dir. of Survey
Downstream
Length Surveyed
300.8 ft.
Total Length
300.8 ft.
Structural Index
4
Structural Quick
4300
Structural Rating
12
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 02 0132 to 02 0131
MH: 02 0132MH: 02 0131downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:55AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG2 ft. MGO - General Observation - 3 MISSING TILES3 ft. MGO - General Observation - TILES 100% IN PLACE START21.8 ft. MGO - General Observation - 4 ROWS MISSING TILES UNDER MAG COAT37.6 ft. MGO - General Observation - 3 ROWS MISSING TILES UNDER MAG COAT40.5 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AQGG UNDER MAG COAT45.1 ft. MGO - General Observation - 1 MISSING TILE UNDER MAG COAT50.1 ft. MGO - General Observation - 4 ROWS MISSING TILES UNDER MAG COAT57.7 ft. MGO - General Observation - 1/4 MISSING TILE 2:0061 ft. MGO - General Observation - 2 TILES MISSING 12:0069.5 ft. MGO - General Observation - 4 ROWS MISSING TILES UNDER MAG COAT78.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - AREAS OF MISSING TILES84.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - MISSING TILES IN FLOW96.8 ft. MGO - General Observation - 1 MISSING TILES 12:00109.1 ft. MGO - General Observation - MISSING TILES 10% START UNDER MAG COAT114.2 ft. MGO - General Observation - 4 ROWS MISSING TILES144 ft. MGO - General Observation - 7 MISSING TILES169.6 ft. MGO - General Observation - 3 ROWS MISSING TILES177.4 ft. MGO - General Observation - 4 ROWS MISSING TILES216.8 ft. MGO - General Observation - 2 ROWS MISSING TILES228.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - MISSING TILES IN FFOW260.1 ft. MGO - General Observation - 4 ROWS MISSING TILES280 ft. MGO - General Observation - 4 ROWS MISSING TILES UNDER MAG COAT START300.2 ft. MGO - General Observation - R ROWS MISSING TILES FINISH300.2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - AREAS OF MISSING TILES UNDER MAG COAT300.8 ft. AMH - Downstream Manhole, Survey Ends - 3:40AM

Observation photos (17)

  • Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - TILES 100% IN PLACE START

    3 ft. - General Observation - TILES 100% IN PLACE START

  • General Observation - 4 ROWS MISSING TILES UNDER MAG COAT

    21.8 ft. - General Observation - 4 ROWS MISSING TILES UNDER MAG COAT

  • General Observation - 3 ROWS MISSING TILES UNDER MAG COAT

    37.6 ft. - General Observation - 3 ROWS MISSING TILES UNDER MAG COAT

  • Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AQGG UNDER MAG COAT

    40.5 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AQGG UNDER MAG COAT

  • General Observation - 4 ROWS MISSING TILES UNDER MAG COAT

    50.1 ft. - General Observation - 4 ROWS MISSING TILES UNDER MAG COAT

  • General Observation - 4 ROWS MISSING TILES UNDER MAG COAT

    69.5 ft. - General Observation - 4 ROWS MISSING TILES UNDER MAG COAT

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - AREAS OF MISSING TILES

    78.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - AREAS OF MISSING TILES

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: NO - MISSING TILES IN FLOW

    84.6 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO - MISSING TILES IN FLOW

  • General Observation - MISSING TILES 10% START UNDER MAG COAT

    109.1 ft. - General Observation - MISSING TILES 10% START UNDER MAG COAT

  • General Observation - 4 ROWS MISSING TILES

    114.2 ft. - General Observation - 4 ROWS MISSING TILES

  • General Observation - 7 MISSING TILES

    144 ft. - General Observation - 7 MISSING TILES

  • General Observation - 3 ROWS MISSING TILES

    169.6 ft. - General Observation - 3 ROWS MISSING TILES

  • General Observation - 4 ROWS MISSING TILES

    177.4 ft. - General Observation - 4 ROWS MISSING TILES

  • General Observation - 2 ROWS MISSING TILES

    216.8 ft. - General Observation - 2 ROWS MISSING TILES

  • General Observation - 4 ROWS MISSING TILES

    260.1 ft. - General Observation - 4 ROWS MISSING TILES

  • General Observation - 4 ROWS MISSING TILES UNDER MAG COAT START

    280 ft. - General Observation - 4 ROWS MISSING TILES UNDER MAG COAT START

Observations (29)

DistanceCodeObservation
216.8MGO2 ROWS MISSING TILES
114.2MGO4 ROWS MISSING TILES
280MGO4 ROWS MISSING TILES UNDER MAG COAT START
50.1MGO4 ROWS MISSING TILES UNDER MAG COAT
57.7MGO1/4 MISSING TILE 2:00
0AMH2:55AM
109.1MGOMISSING TILES 10% START UNDER MAG COAT
96.8MGO1 MISSING TILES 12:00
37.6MGO3 ROWS MISSING TILES UNDER MAG COAT
300.8AMH3:40AM
84.6DSZMISSING TILES IN FLOW
45.1MGO1 MISSING TILE UNDER MAG COAT
2SAMSEVERE AGG
0MWM
2MGO3 MISSING TILES
69.5MGO4 ROWS MISSING TILES UNDER MAG COAT
3MGOTILES 100% IN PLACE START
169.6MGO3 ROWS MISSING TILES
177.4MGO4 ROWS MISSING TILES
300.2MGOR ROWS MISSING TILES FINISH
300.2SAMAREAS OF MISSING TILES UNDER MAG COAT
260.1MGO4 ROWS MISSING TILES
21.8MGO4 ROWS MISSING TILES UNDER MAG COAT
61MGO2 TILES MISSING 12:00
228.2DSZMISSING TILES IN FFOW
40.5SAMSEVERE AQGG UNDER MAG COAT
144MGO7 MISSING TILES
0MWL
78.4SAMAREAS OF MISSING TILES

Properties (6)

custom_field_three
MISSING SEVERE AGG AREAS OF MISSING TILES
custom_field_two
2
customer
LACSD
datetime
2019-02-20T00:56:55-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false