Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 1, 2018, 09:37 AM
  • 05 0177_05 0176 _11012018_015021.mp4

Date
11/01/2018
W/O
735493
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05469
Time
2:37 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6207
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
WO_735493_TV05228_NOV2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 0177
Downstream MH
05 0176
Dir. of Survey
Downstream
Length Surveyed
327.4 ft.
Total Length
327.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
4133
O&M Rating
14
Overall Index
3
Overall Quick
Overall Rating
14
Pipe schematic from manhole 05 0177 to 05 0176
MH: 05 0177MH: 05 0176downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 01770 ft. MWL - Water Level, 10 %of cross sectional area38.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"38.7 ft. RMC - Roots Medium Connection, from 02 to 05 o'clock, 35 %, within 8 inches of joint: NO85.5 ft. RBL - Roots Ball Lateral, at 02 o'clock, 95 %85.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"89.4 ft. RMC - Roots Medium Connection, from 08 to 10 o'clock, 15 %, within 8 inches of joint: NO90.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"129.8 ft. RML - Roots Medium Lateral, at 02 o'clock, 35 %, within 8 inches of joint: NO129.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"129.8 ft. RFC - Roots Fine Connection, from 02 to 05 o'clock170.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"190.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"253.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"258.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"327.4 ft. AMH - Downstream Manhole, Survey Ends - 05 0176327.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK327.4 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (1)

  • Roots Medium Connection, from 02 to 05 o'clock, 35 %, within 8 inches of joint: NO

    38.7 ft. - Roots Medium Connection, from 02 to 05 o'clock, 35 %, within 8 inches of joint: NO

Observations (19)

DistanceCodeObservation
327.4AMH05 0176
90.6TF
327.4MGOCONNECTION AT MH 3 O'CLOCK
0MWM
327.4MGOCONNECTION AT MH 9 O'CLOCK
129.8RML
85.5RBL
190.7TF
170.1TF
89.4RMC
129.8TF
0AMH05 0177
38.6TF
85.5TF
253.8TF
38.7RMC
258.9TF
129.8RFC
0MWL

Properties (7)

additional_info
SC365235
custom_field_two
4
customer
LACSD
datetime
2018-11-01T02:37:41-07:00
documentation
PROPIPE
is_lateral_inspection
false
lining
CIPP