Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 7, 2018, 07:21 AM
  • 05 2166_05 0137 _11062018_234818.mp4

Date
11/06/2018
W/O
735493
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05429
Time
11:21 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6211
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
LAWNDALE
Loc. details
Alley
Location Code
H
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Routine Assessment
Project
WO_735493_TV05228_NOV2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
05 0137
Downstream MH
05 2166
Dir. of Survey
Upstream
Length Surveyed
151.4 ft.
Total Length
151.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2E00
O&M Rating
58
Overall Index
2
Overall Quick
Overall Rating
58
Pipe schematic from manhole 05 0137 to 05 2166
MH: 05 0137MH: 05 2166upstream0 ft. MGO - General Observation - CONNECTION AT MH 12 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Ends - 05 21660 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2.5 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish149.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start151.4 ft. AMH - Downstream Manhole, Survey Begins - 05 0137151.4 ft. MWL - Water Level, 5 %of cross sectional area151.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK151.4 ft. MWM - Water Mark, 5 %of cross sectional area

Observation photos (1)

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0AMH05 0137
151.4MGOCONNECTION AT MH 12 O'CLOCK
151.4AMH05 2166
0MWL
148.9DSZ
151.4MGOCONNECTION AT MH 3 O'CLOCK
2.1DSZ
0MGOCONNECTION AT MH 3 O'CLOCK
0MWM

Properties (7)

additional_info
SC365239
custom_field_two
4
customer
LACSD
datetime
2018-11-06T23:21:54-08:00
documentation
PROPIPE
is_lateral_inspection
false
lining
CIPP