Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 1, 2018, 11:04 AM
  • 05 0173_05 0172 _11012018_031437.mp4

Date
11/01/2018
W/O
735493
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00431
PipeID
P05465
Time
4:04 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6207
Sewer Name
05 DISTRICT #5 MAIN TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
10
Purpose
Routine Assessment
Project
WO_735493_TV05228_NOV2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 0173
Downstream MH
05 0172
Dir. of Survey
Downstream
Length Surveyed
330.7 ft.
Total Length
330.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2600
O&M Rating
12
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 05 0173 to 05 0172
MH: 05 0173MH: 05 0172downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 017331.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"82.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"123 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"168.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"227.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"232.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"298.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start330.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Finish330.7 ft. AMH - Downstream Manhole, Survey Ends - 05 0172330.7 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK330.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (1)

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: NO, Start

    298.9 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: NO, Start

Observations (14)

DistanceCodeObservation
330.7DSZ
123TF
168.9TF
330.7AMH05 0172
227.6TF
0MWM
330.7MGOCONNECTION AT MH 9 O'CLOCK
31.9TF
82.8TF
0MWL
0AMH05 0173
232.4TF
330.7MGOCONNECTION AT MH 3 O'CLOCK
298.9DSZ

Properties (7)

additional_info
SC365235
custom_field_two
4
customer
LACSD
datetime
2018-11-01T04:04:09-07:00
documentation
PROPIPE
is_lateral_inspection
false
lining
CIPP