Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 16, 2019, 07:05 AM
  • 22 0248_22 0247 _01152019_231934.mp4

Date
01/15/2019
W/O
745548
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00793
PipeID
P16530
Time
11:05 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6355
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_745548_TV22160_JAN2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0248
Downstream MH
22 0247
Dir. of Survey
Downstream
Length Surveyed
291.8 ft.
Total Length
291.8 ft.
Structural Index
3
Structural Quick
3K2J
Structural Rating
282
O&M Index
2
O&M Quick
412K
O&M Rating
120
Overall Index
2
Overall Quick
Overall Rating
402
Pipe schematic from manhole 22 0248 to 22 0247
MH: 22 0248MH: 22 0247downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02480 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start18.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start30.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"81.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"103 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"127.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"157.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"182 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"203.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"221 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"248.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"290.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish290.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish290.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish291.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0247291.8 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    18.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
2DAGS
0AMH22 0248
127.5TFC
291.8AMH22 0247
0MWM
0MWL
2.1SAP
221TFC
103TFC
203.2TFC
18.6SSS
291.8MGOACTIVE CONNECTION AT MH 3 O'CLOCK
30.2TFC
290.5SSS
290.5SAP
290.5DAGS
51.5TFC
81.9TFC
248.4TFC
157.8TFC
182TFC

Properties (6)

additional_info
SC365671
custom_field_two
2
customer
LACSD
datetime
2019-01-15T23:05:15-08:00
documentation
PRO PIPE
is_lateral_inspection
false