Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2018, 10:40 AM
  • 18 0306A_18 0306 _12312018_024657.mp4

Date
12/31/2018
W/O
740170
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00683
PipeID
P14138
Time
2:40 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6286
Sewer Name
18 LA MIRADA TRUNK, SECTS 1&2
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_740170_TV18098_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0306A
Downstream MH
18 0306
Dir. of Survey
Downstream
Length Surveyed
110 ft.
Total Length
110 ft.
Structural Index
3
Structural Quick
5C3C
Structural Rating
210
O&M Index
2
O&M Quick
2C00
O&M Rating
42
Overall Index
3
Overall Quick
Overall Rating
252
Pipe schematic from manhole 18 0306A to 18 0306
MH: 18 0306AMH: 18 0306downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 0306A2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"95.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"108.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish108.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish108.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish108.5 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish110 ft. AMH - Downstream Manhole, Survey Ends - 18 0306

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2SAP
0MWL
2DAGS
108.5SSS
108.5DAGS
0MWM
47.8TFC
2SRV
95.3TFC
110AMH18 0306
0AMH18 0306A
108.5SAP
108.5SRV
2SSS

Properties (6)

additional_info
SC365652
custom_field_two
2
customer
LACSD
datetime
2018-12-31T02:40:20-08:00
documentation
PRO PIPE
is_lateral_inspection
false