Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2018, 10:14 AM
  • 18 0310_18 0309 _12312018_022807.mp4

Date
12/31/2018
W/O
740143
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00683
PipeID
P14142
Time
2:14 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6285
Sewer Name
18 LA MIRADA TRUNK, SECTS 1&2
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_740143_TV18145_DEC2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0310
Downstream MH
18 0309
Dir. of Survey
Downstream
Length Surveyed
277.8 ft.
Total Length
277.8 ft.
Structural Index
3
Structural Quick
5J3J
Structural Rating
546
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
3
Overall Quick
Overall Rating
656
Pipe schematic from manhole 18 0310 to 18 0309
MH: 18 0310MH: 18 0309downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 03102 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start52 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"100.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"147.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"203.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"251.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"275.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish275.7 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish275.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish275.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish277.8 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK277.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0309

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    12 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
0MWM
275.7DAGS
275.7SRV
52TFA
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
251.7TFC
12SSS
275.7SAP
2DAGS
277.8MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2SRV
203.7TFC
0MWL
277.8AMH18 0309
0AMH18 0310
275.7SSS
100.1TFC
147.4TFC
2SAP

Properties (6)

additional_info
SC365651
custom_field_two
2
customer
LACSD
datetime
2018-12-31T02:14:02-08:00
documentation
PRO PIPE
is_lateral_inspection
false