18 0316_18 0315 _12312018_041859.mp4
2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
267.3 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
450.4 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 2 | SRV | — |
| 425.7 | SRV | — |
| 2 | DAGS | — |
| 0 | MWM | — |
| 0 | AMH | 18 0316 |
| 213.1 | TFC | — |
| 267.3 | SRV | — |
| 2 | SSS | — |
| 483 | AMH | 18 0315 |
| 481.5 | SSS | — |
| 450.4 | SRV | — |
| 481.5 | SAP | — |
| 0 | MWL | — |
| 481.5 | DAGS | — |
| 218.4 | SRV | — |
| 2 | SAP | — |