Wastewater/Activity/PacpInspection/1.0Feb 13, 2019, 10:25 AM
  • 01 0442_01 0441_2132019_023443.mp4

Date
02/13/2019
W/O
0755136
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00208
PipeID
P00924
Time
2:25 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1110
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
WILLOW BROOK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20190212MDM_HOLMES_WILLOWBROOK_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
01 0441
Downstream MH
01 0442
Dir. of Survey
Upstream
Length Surveyed
347.8 ft.
Total Length
347.8 ft.
Structural Index
3
Structural Quick
4322
Structural Rating
16
O&M Index
2
O&M Quick
4112
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
22
Pipe schematic from manhole 01 0441 to 01 0442
MH: 01 0441MH: 01 0442upstream0 ft. AMH - Upstream Manhole, Survey Ends - 3:00AM0.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED0.6 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG9.7 ft. MWM - Water Mark, 50 %of cross sectional area27.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open65.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active75.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Active79 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped91.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open117.1 ft. SAM - Surface Aggregate Missing, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG DEEP CORR0SON125.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped125.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active134.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open138 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped158.3 ft. SSS - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED181.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open192.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open199.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Active217.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open227 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR - 4%231.3 ft. RFJ - Roots Fine Joint, from 10 to 02 o'clock, within 8 inches of joint: YESR - 3%236.2 ft. SAM - Surface Aggregate Missing, from 02 to 04 o'clock, within 8 inches of joint: NO - SEV ERE AGG242.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open266.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped272.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open289 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open320.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Active341 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open345.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATT ACHED345.8 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG347.8 ft. MWL - Water Level, 10 %of cross sectional area347.8 ft. MWM - Water Mark, 20 %of cross sectional area347.8 ft. AMH - Downstream Manhole, Survey Begins - 2:25AM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATT ACHED

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATT ACHED

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Missing, from 02 to 04 o'clock, within 8 inches of joint: NO - SEV ERE AGG

    111.6 ft. - Surface Aggregate Missing, from 02 to 04 o'clock, within 8 inches of joint: NO - SEV ERE AGG

  • Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    189.5 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG DEEP CORR0SON

    230.7 ft. - Surface Aggregate Missing, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG DEEP CORR0SON

Observations (33)

DistanceCodeObservation
155.7TFOpen
2SSSPEELING CONCRETE SEVERE AGG ATT ACHED
347.2SSSPEELING CONCRETE SEVERE AGG ATTACHED
255.9TFOpen
189.5SSSPEELING CONCRETE SEVERE AGG ATTACHED
213.4TBOpen
230.7SAMSEVERE AGG DEEP CORR0SON
222.6TFCCapped
347.2SAMSEVERE AGG
81.4TFCCapped
320.7TFOpen
104.9TFOpen
282.4TFActive
0MWL
58.8TFOpen
111.6SAMSEV ERE AGG
209.8TFCCapped
268.8TFCCapped
347.8AMH3:00AM
147.9TFActive
130TFOpen
166TFOpen
0MWM
222TBActive
272TFActive
27.2TFActive
75.5TFOpen
2SAMSEVERE AGG
120.8RFJ4%
116.5RFJ3%
0AMH2:25AM
6.8TFOpen
338.1MWM

Properties (4)

custom_field_three
DEEP PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2019-02-13T02:25:00-08:00