Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2019, 09:09 PM
  • C 0311_C 0310_252019_131426.mp4

Date
02/05/2019
W/O
0753893
Weather
Heavy Rain
Operator/Surveyor
FRANKLIN
Sewer ID
Z00135
PipeID
P09771
Time
1:09 PM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7910
Sewer Name
C JOINT OUTFALL C - UNIT 6F
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Capital Improvement Program Assesment
Project
20190205DF_JOINT_OUTFALL_C_UNIT_6F
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Upstream MH
C 0311
Downstream MH
C 0310
Dir. of Survey
Downstream
Length Surveyed
892.3 ft.
Total Length
892.3 ft.
Structural Index
4
Structural Quick
5232
Structural Rating
16
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
4
Overall Quick
Overall Rating
18
Pipe schematic from manhole C 0311 to C 0310
MH: C 0311MH: C 0310downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:11 PM2 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG2 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: YES2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.2 ft. MGP - General Photograph18 ft. MGP - General Photograph136.9 ft. MGP - General Photograph150.5 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 4" - Open254.1 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish254.1 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish301.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"404 ft. MGP - General Photograph538.8 ft. MGP - General Photograph566.6 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"567.7 ft. MGP - General Photograph761.7 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 4" - Open793.4 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 90% MAG793.4 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 30% MAG890.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish890.5 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 90% MAG890.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish892.3 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)892.3 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach892.3 ft. AMH - Downstream Manhole, Survey Ends - 2:05 PM

Observation photos (12)

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 04 to 05 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: YES

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    9.2 ft. - General Photograph

  • General Photograph

    18 ft. - General Photograph

  • General Photograph

    136.9 ft. - General Photograph

  • General Photograph

    404 ft. - General Photograph

  • General Photograph

    538.8 ft. - General Photograph

  • General Photograph

    567.7 ft. - General Photograph

Observations (29)

DistanceCodeObservation
566.6TBA
892.3MGOGREASE THROUGHOUT THE REACH (5%)
2SRC
9.2MGP
890.5SAP
2SRV
892.3MGOPeeling & Flaking Throughout The Reach
404MGP
567.7MGP
890.5SZ90% MAG
890.5SAV
2SZ30% MAG
793.4SZ90% MAG
254.1SRV
301.1TFA
892.3AMH2:05 PM
150.5TBOpen
0MWM
136.9MGP
538.8MGP
254.1SRC
0MWL
2DAE
2SAV
18MGP
793.4SZ30% MAG
2SAP
0AMH1:11 PM
761.7TBOpen

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-02-05T13:09:39-08:00
documentation
FRANKLIN, IGNACIO, RUVALCABA
is_lateral_inspection
false