Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 6, 2019, 05:24 PM
  • 02 1944A_02 1944_262019_101921.mp4

Date
02/06/2019
W/O
0751205
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00246
PipeID
P04247
Time
9:24 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7911
Sewer Name
02 DOUGLAS AVENUE TRUNK
City
EAST L.A.
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Capital Improvement Program Assesment
Project
20190201DF_DOUGLAS_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
02 1944A
Downstream MH
02 1944
Dir. of Survey
Downstream
Length Surveyed
268.7 ft.
Total Length
268.7 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 02 1944A to 02 1944
MH: 02 1944AMH: 02 1944downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:16 AM0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start39.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"92.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open105.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"110.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"175.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"190.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open207 ft. MGP - General Photograph234.1 ft. MGP - General Photograph260.8 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 4" - Open266.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish266.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish267 ft. MGO - General Observation - ROACHES @ MH268.7 ft. AMH - Downstream Manhole, Survey Ends - 10:51 AM268.7 ft. MGO - General Observation - Grease Throughout The Reach (5%)

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • General Photograph

    207 ft. - General Photograph

  • General Photograph

    234.1 ft. - General Photograph

Observations (20)

DistanceCodeObservation
0AMH10:16 AM
268.7AMH10:51 AM
110.5TFC
207MGP
190.3TFOpen
234.1MGP
266.8SSS
266.8DAGS
267MGOROACHES @ MH
2SSS
0MGOROACHES @ MH
0MWL
260.8TFOpen
268.7MGOGrease Throughout The Reach (5%)
39.6TFC
105.4TFA
2DAGS
0MWM
175.5TFC
92.7TFOpen

Properties (6)

additional_info
THE ONSCREEN PIPE SIZE IS WRONG. THE CORRECT PIPE SIZE IS 8".
custom_field_two
3
customer
LACSD
datetime
2019-02-06T09:24:32-08:00
documentation
FRANKLIN, IGNACIO, RUVALCABA
is_lateral_inspection
false