Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 3, 2018, 10:33 AM
  • 32 0211_32 0210 _12032018_024720.mp4

Date
12/03/2018
W/O
735047
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00885
PipeID
P19966
Time
2:33 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6261
Sewer Name
32 AVENUE SCOTT TRUNK
City
SANTA CLARITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
06
Purpose
Routine Assessment
Project
RFIR_WO_735047_TV32054_NOV2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
32 0211
Downstream MH
32 0210
Dir. of Survey
Downstream
Length Surveyed
334.1 ft.
Total Length
334.1 ft.
Structural Index
3
Structural Quick
4132
Structural Rating
12
O&M Index
2
O&M Quick
2W00
O&M Rating
236
Overall Index
2
Overall Quick
Overall Rating
248
Pipe schematic from manhole 32 0211 to 32 0210
MH: 32 0211MH: 32 0210downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 02110 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start70.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start156.4 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES158 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES158 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"165.2 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES328.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish328.8 ft. CS - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES334 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish334.1 ft. AMH - Downstream Manhole, Survey Ends - 32 0210

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    70.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    156.4 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES

    158 ft. - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    165.2 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES

    328.8 ft. - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES

Observations (13)

DistanceCodeObservation
2DAGS
70.3DAE
328.8DAE
165.2FL
0AMH32 0211
328.8CS
158FM
0MWM
334DAGS
334.1AMH32 0210
156.4FL
0MWL
158TFA

Properties (6)

additional_info
SC365377
custom_field_two
2
customer
LACSD
datetime
2018-12-03T02:33:39-08:00
documentation
PRO PIPE
is_lateral_inspection
false