Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2018, 09:30 AM
  • 05 0345_05 0344 _11202018_015632.mp4

Date
11/20/2018
W/O
735027
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00432
PipeID
P05559
Time
1:30 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6226
Sewer Name
05 DISTRICT #5 MAIN RELIEF TRUNK
City
LAWNDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_735027_TV05325_NOV2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
05 0345
Downstream MH
05 0344
Dir. of Survey
Downstream
Length Surveyed
499.3 ft.
Total Length
499.3 ft.
Structural Index
3
Structural Quick
3R2O
Structural Rating
450
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
450
Pipe schematic from manhole 05 0345 to 05 0344
MH: 05 0345MH: 05 0344downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 03450 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area14.3 ft. MGO - General Observation - MAG COAT14.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start88.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start88.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish88.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start492.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish494.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish499.3 ft. AMH - Downstream Manhole, Survey Ends - 05 0344

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    88.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
14.3MGOMAG COAT
88.9SSS
0AMH05 0345
494.9SAP
0MWL
499.3AMH05 0344
88.9SAV
88.9SAP
14.3SAV
0MWM
492.9SSS

Properties (6)

additional_info
SC365454
custom_field_two
2
customer
LACSD
datetime
2018-11-20T01:30:21-08:00
documentation
PROPIPE
is_lateral_inspection
false