Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2019, 07:34 PM
  • B 0017_B 0016_1292019_120742.mp4

Date
01/29/2019
W/O
0734335
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00072
PipeID
P08527
Time
11:34 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7906
Sewer Name
B JOINT OUTFALL B - UNIT 1A
City
CARSON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
14
Purpose
Capital Improvement Program Assesment
Project
20190128DF_JOINT_OUTFALL_B_UNIT_1A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
120 in.
Upstream MH
B 0017
Downstream MH
B 0016
Dir. of Survey
Downstream
Length Surveyed
566.9 ft.
Total Length
566.9 ft.
Structural Index
4
Structural Quick
5232
Structural Rating
18
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
18
Pipe schematic from manhole B 0017 to B 0016
MH: B 0017MH: B 0016downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:00 PM0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG8.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start38 ft. MGP - General Photograph317 ft. MGP - General Photograph399.7 ft. MGP - General Photograph519.1 ft. MGP - General Photograph562.2 ft. MGP - General Photograph564.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish564.1 ft. MGP - General Photograph565.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish565.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish565.6 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 30% MAG565.6 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)565.6 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish565.6 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach565.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish566.9 ft. AMH - Downstream Manhole, Survey Ends - 12:44 PM

Observation photos (12)

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 30% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    38 ft. - General Photograph

  • General Photograph

    317 ft. - General Photograph

  • General Photograph

    399.7 ft. - General Photograph

  • General Photograph

    519.1 ft. - General Photograph

  • General Photograph

    562.2 ft. - General Photograph

  • General Photograph

    564.1 ft. - General Photograph

Observations (24)

DistanceCodeObservation
2SRV
399.7MGP
2SRC
565.6SSS
8.2SSS
564.1SAV
565.6SAP
565.6SZ30% MAG
317MGP
562.2MGP
0AMH12:00 PM
38MGP
2SAP
0MWM
566.9AMH12:44 PM
2SAV
565.6MGOGREASE THROUGHOUT THE REACH (5%)
2SZ30% MAG
565.6SRC
0MWL
565.6MGOPeeling & Flaking Throughout The Reach
565.6SRV
519.1MGP
564.1MGP

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-01-29T11:34:17-08:00
documentation
FRANKLIN, CASTILLO, IGNACIO, SHADLER
is_lateral_inspection
false