Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 18, 2019, 05:40 PM
  • Section#4_15 0843_15 0842__1182019__I0096.mp4

Date
01/18/2019
W/O
0749485
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00594
PipeID
P12651
Time
9:40 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0096
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 3&2A
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
01
Purpose
Routine Assessment
Project
20190118MI_ARCADIA_SIERRA_MADRE_TRUNK_SECTS_3_2A
Material
NRCP
Shape
Circular
Height
9.350000381469727 in.
Upstream MH
15 0843
Downstream MH
15 0842
Dir. of Survey
Downstream
Length Surveyed
312.9 ft.
Total Length
312.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 15 0843 to 15 0842
MH: 15 0843MH: 15 0842downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:45 PM8.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES9.5 ft. MGO - General Observation - CIPP LINER62.8 ft. MGO - General Observation - LINER SEAM VISIBLE THROUGHOUT THE REACH, 12 TO 2 OCLOCK74.3 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"136.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"139.5 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"235 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"244.1 ft. MGP - General Photograph - CIPP LINER 8 OCLOCK257.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"303 ft. TFI - Tap Factory Made Intruding, at 09 o'clock, -, -, within 8 inches of joint: NO, 6", 1"311.1 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH, 4 TO 8 OCLOCK311.1 ft. MGP - General Photograph - CIPP LINER312.9 ft. AMH - Downstream Manhole, Survey Ends - 01:13 PM

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock,  , within 8 inches of joint: YES

    8.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: YES

  • General Observation - CIPP LINER

    9.5 ft. - General Observation - CIPP LINER

  • General Observation - LINER SEAM VISIBLE THROUGHOUT THE REACH, 12 TO 2 OCLOCK

    62.8 ft. - General Observation - LINER SEAM VISIBLE THROUGHOUT THE REACH, 12 TO 2 OCLOCK

  • General Photograph - CIPP LINER 8 OCLOCK

    244.1 ft. - General Photograph - CIPP LINER 8 OCLOCK

  • General Photograph - CIPP LINER

    311.1 ft. - General Photograph - CIPP LINER

  • Downstream Manhole, Survey Ends - 01:13 PM

    312.9 ft. - Downstream Manhole, Survey Ends - 01:13 PM

Observations (16)

DistanceCodeObservation
8.7DAGS
0MWM
74.3TFA
311.1MGOGREASE THROUGHOUT THE REACH, 4 TO 8 OCLOCK
0MWL
235TFA
136.9TFA
139.5TFA
0AMH12:45 PM
62.8MGOLINER SEAM VISIBLE THROUGHOUT THE REACH, 12 TO 2 OCLOCK
312.9AMH01:13 PM
311.1MGPCIPP LINER
257.5TFA
244.1MGPCIPP LINER 8 OCLOCK
303TFI
9.5MGOCIPP LINER

Properties (3)

custom_field_two
4
customer
LACSD
datetime
2019-01-18T09:40:19-08:00