Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 10, 2019, 08:51 AM
  • Section#1_G 0036_G 0035__1102019__I0088.mp4

Date
01/10/2019
W/O
0749250
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00343
PipeID
P10398
Time
12:51 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0088
Sewer Name
G JOINT OUTFALL G - UNIT 3
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Capital Improvement Program Assesment
Project
20190110MDM_JOINT_OUTFALL_G_UNIT_3
Material
Vitrified Clay Pipe
Shape
Circular
Height
33 in.
Upstream MH
G 0036
Downstream MH
G 0035
Dir. of Survey
Downstream
Length Surveyed
395.8 ft.
Total Length
395.8 ft.
Structural Index
2
Structural Quick
3223
Structural Rating
12
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole G 0036 to G 0035
MH: G 0036MH: G 0035downstream0 ft. MGO - General Observation - MH CONN 3:00 ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 1:15AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area8.3 ft. MGO - General Observation - WHITE COATING ON PIPE START37.7 ft. FC - Fracture Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES - HAIRLOINE58 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - H216.7 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, - SLIGHT285.6 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 04 to 06 o'clock, , within 8 inches of joint: YES - ROCK285.6 ft. FC - Fracture Circumferential, from 12 to 02 o'clock, within 8 inches of joint: YES - SLIGHT285.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN372.5 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - H395.3 ft. MGO - General Observation - WHITE COATING ON PIPE FINISH395.3 ft. MGO - General Observation - MH CONN 9:00 OPEN395.8 ft. AMH - Downstream Manhole, Survey Ends - 2:15AM

Observation photos (2)

  • General Observation - WHITE COATING ON PIPE START

    8.3 ft. - General Observation - WHITE COATING ON PIPE START

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES,  - SLIGHT

    216.7 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, - SLIGHT

Observations (15)

DistanceCodeObservation
0MGOMH CONN 3:00 ACTIVE
8.3MGOWHITE COATING ON PIPE START
285.6DSZROCK
395.8AMH2:15AM
395.3MGOWHITE COATING ON PIPE FINISH
0AMH1:15AM
285.6FCSLIGHT
372.5FCH
395.3MGOMH CONN 9:00 OPEN
58FLH
0MWL
285.6TFOPEN
37.7FCHAIRLOINE
216.7FLSLIGHT
0MWM

Properties (4)

custom_field_three
SLIGHT FRACTURES
custom_field_two
3
customer
LACSD
datetime
2019-01-10T00:51:46-08:00