Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 25, 2018, 06:43 AM
  • 20 0351_20 0350_24102018_234416.mp4

Date
10/24/2018
W/O
729533
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00756
PipeID
P19300
Time
11:43 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6182
Sewer Name
20 56TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
09
Purpose
Routine Assessment
Project
WO_729533_TV20013_OCT2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0351
Downstream MH
20 0350
Dir. of Survey
Downstream
Length Surveyed
384.2 ft.
Total Length
384.2 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
412]
O&M Rating
304
Overall Index
2
Overall Quick
Overall Rating
310
Pipe schematic from manhole 20 0351 to 20 0350
MH: 20 0351MH: 20 0350downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 03510 ft. MWL - Water Level, 35 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start6.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start30.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"53.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"79.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"102.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"129 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"155.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"178.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"204.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"227.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"227.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"254.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"281.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"303.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"314.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"349.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"378.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start378.9 ft. MMC - Material Change, Concrete pipe (non-reinfored)378.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish383.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish383.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish384.2 ft. AMH - Downstream Manhole, Survey Ends - 20 0350

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    6.9 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    378.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Concrete pipe (non-reinfored)

    378.9 ft. - Material Change, Concrete pipe (non-reinfored)

Observations (26)

DistanceCodeObservation
2DAGS
378.9MMC
349.3TFC
227.3TFC
227.3TFC
129TFC
102.4TFC
178.5TFC
0MWM
378.8SAP
0AMH20 0351
30.6TFC
384.2AMH20 0350
383.1DAGS
155.6TFC
53.3TFC
378.9DAE
303.9TFC
383.1SAP
79.8TFC
254.7TFC
6.9DAE
314.3TFC
281.3TFC
204.5TFC
0MWL

Properties (4)

additional_info
SC365147
custom_field_two
4
customer
LACSD
datetime
2018-10-24T23:43:47-07:00