Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 6, 2018, 07:36 AM
  • 14 0176_14 0175_09062018_003636.mp4

Date
09/06/2018
W/O
723913
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00584
PipeID
P18214
Time
12:36 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6023
Sewer Name
14 WEST SIDE TRUNK
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
18
Purpose
Routine Assessment
Project
WO_723913_TV14035_SEP2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0176
Downstream MH
14 0175
Dir. of Survey
Downstream
Length Surveyed
187.4 ft.
Total Length
187.4 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
185
O&M Index
2
O&M Quick
412F
O&M Rating
78
Overall Index
2
Overall Quick
Overall Rating
263
Pipe schematic from manhole 14 0176 to 14 0175
MH: 14 0176MH: 14 0175downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 01760 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start185.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish185.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish185.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish185.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE187.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0175

Observation photos (4)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    185.1 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (12)

DistanceCodeObservation
0AMH14 0176
0MWM
185.1SSS
185.1DAGS
2SSS
185.1SAP
185.1MGOCOCKROACHES IN MANHOLE
2DAGS
187.4AMH14 0175
2SAP
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0MWL

Properties (4)

additional_info
SC364787
custom_field_two
2
customer
LACSD
datetime
2018-09-06T00:36:22-07:00