Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 23, 2018, 07:48 AM
  • H 1058H 0951 District 21_112118101644.mpg

Date
10/23/2018
W/O
718172
Weather
Dry
Operator/Surveyor
B. FUGATE
Sewer ID
Z01005
PipeID
P15365
Time
12:48 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K1685
Sewer Name
H JOINT OUTFALL H - UNIT 7C
City
CITY OF INDUSTRY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
34
Purpose
Routine Assessment
Project
WO_718172_TV21087_AUG2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 1058
Downstream MH
H 0951
Dir. of Survey
Downstream
Length Surveyed
33 ft.
Total Length
33.1 ft.
Structural Index
3
Structural Quick
5136
Structural Rating
23
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
23
Pipe schematic from manhole H 1058 to H 0951
MH: H 1058MH: H 0951downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 10580 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish21.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31.2 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO33.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish33.1 ft. AMH - Downstream Manhole, Survey Ends - H 0951

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    21.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
21.1SAV
0MWM
33.1SAP
21.1SAP
2.1SAV
0AMHH 1058
0MWL
0MGOCONNECTION AT MH 3 O'CLOCK
33.1AMHH 0951
31.2SRV

Properties (6)

additional_info
SC365228
custom_field_two
3
customer
LACSD
datetime
2018-10-23T00:48:00-07:00
documentation
PROPIPE
is_lateral_inspection
false