Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 2, 2019, 11:45 AM
  • 18 0300_18 0562_122019_035201.mp4

Date
01/02/2019
W/O
0744636
Weather
Dry
Operator/Surveyor
Reveles
Sewer ID
Z00683
PipeID
P14131
Time
3:45 AM
Certificate
U-115-06022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1092
Sewer Name
18 LA MIRADA TRUNK, SECTS 1&2
City
La Mirada
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
12312018VMR_LA_MIRADA_TRUNK_SECTS_1AND_2
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
18 0300
Downstream MH
18 0562
Dir. of Survey
Downstream
Length Surveyed
334 ft.
Total Length
334 ft.
Structural Index
5
Structural Quick
5200
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
5
Overall Quick
Overall Rating
10
Pipe schematic from manhole 18 0300 to 18 0562
MH: 18 0300MH: 18 0562downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 03:59 AM2 ft. SZ - Surface Other, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - Mag Coat36.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 2"47.2 ft. SRC - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: NO85.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 2"133.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 2"141.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 2"238.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 2"246 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 2"257 ft. SRC - Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: NO302.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 2"310.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 2"330.5 ft. SZ - Surface Other, from 10 to 02 o'clock, within 8 inches of joint: NO, Finish - Mag Coat334 ft. AMH - Downstream Manhole, Survey Ends - 04:25 AM

Observation photos (3)

  • Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: NO

    47.2 ft. - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: NO

  • Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 2"

    246 ft. - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 2"

  • Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: NO

    257 ft. - Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: NO

Observations (16)

DistanceCodeObservation
302.7TFC
334AMH04:25 AM
133.6TF
238.6TFC
310.1TFC
330.5SZMag Coat
47.2SRC
85.2TFC
0MWM
2SZMag Coat
257SRC
0MWL
141.4TFC
36.7TFC
246TFC
0AMH03:59 AM

Properties (3)

custom_field_two
2
customer
LACSD
datetime
2019-01-02T03:45:00-08:00