Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 30, 2018, 09:16 AM
  • 01 0698_01 0697_20180830_022824.mp4

Date
08/30/2018
W/O
723858
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00199
PipeID
P01407
Time
2:16 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5991
Sewer Name
01 CALIFORNIA AVENUE EXTENSION TRUNK
City
South Gate
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Routine Assessment
Project
WO_723858_TV01117_SEP2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
01 0697
Downstream MH
01 0698
Dir. of Survey
Upstream
Length Surveyed
326.6 ft.
Total Length
326.6 ft.
Structural Index
3
Structural Quick
5G3L
Structural Rating
520
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
520
Pipe schematic from manhole 01 0697 to 01 0698
MH: 01 0697MH: 01 0698upstream0 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 01 06980 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish205 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start298.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start322.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start324.5 ft. MGO - General Observation - MAG COAT326.6 ft. MWM - Water Mark, 25 %of cross sectional area326.6 ft. AMH - Downstream Manhole, Survey Begins - 01 0697326.6 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    28.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    121.6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
326.6SRV
121.6SRV
326.6AMH01 0698
326.6SAP
28.4SSS
0MWM
0AMH01 0697
2.1MGOMAG COAT
0MWL
3.9SAP
326.6SSS

Properties (6)

additional_info
SC364805
custom_field_two
2
customer
LACSD
datetime
2018-08-30T02:16:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false