Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 21, 2018, 09:16 AM
  • E 0021_E 0126_09212018_021845.mp4

Date
09/21/2018
W/O
724206
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00027
PipeID
P23241
Time
2:16 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6038
Sewer Name
E JOINT OUTFALL E - UNIT 1
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Routine Assessment
Project
WO_724206_TV30070_SEP2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
E 0021
Downstream MH
E 0126
Dir. of Survey
Downstream
Length Surveyed
229.9 ft.
Total Length
229.9 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
225
O&M Index
2
O&M Quick
412M
O&M Rating
144
Overall Index
2
Overall Quick
Overall Rating
369
Pipe schematic from manhole E 0021 to E 0126
MH: E 0021MH: E 0126downstream0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 00210 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start100.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS226.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish226.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish226.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish226.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish229.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK229.9 ft. AMH - Downstream Manhole, Survey Ends - E 0126

Observation photos (5)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

    229.9 ft. - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observations (14)

DistanceCodeObservation
2SSS
226.7SSS
226.7DAGS
229.9MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2SAP
0MGOCOCKROACHES IN MANHOLE
229.9AMHE 0126
0MWM
100.6DSZDEBRIS
226.7SAP
2DAGS
0AMHE 0021
226.7DSZ
0MWL

Properties (4)

additional_info
SC364836
custom_field_two
2
customer
LACSD
datetime
2018-09-21T02:16:52-07:00