Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 21, 2018, 07:55 AM
  • E 0023_E 0022_09212018_005508.mp4

Date
09/21/2018
W/O
724206
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00027
PipeID
P07604
Time
12:55 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6038
Sewer Name
E JOINT OUTFALL E - UNIT 1
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
20
Purpose
Routine Assessment
Project
WO_724206_TV30070_SEP2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
E 0023
Downstream MH
E 0022
Dir. of Survey
Downstream
Length Surveyed
396.3 ft.
Total Length
396.3 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
390
O&M Index
2
O&M Quick
2O00
O&M Rating
158
Overall Index
2
Overall Quick
Overall Rating
548
Pipe schematic from manhole E 0023 to E 0022
MH: E 0023MH: E 0022downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 00230 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start6.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start394.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish394.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish394.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish396.3 ft. AMH - Downstream Manhole, Survey Ends - E 0022

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
6.9SSS
0MWL
0AMHE 0023
394.6SAP
394.6SSS
394.6DAGS
396.3AMHE 0022
0MWM
6.9SAP
2DAGS

Properties (4)

additional_info
SC364836
custom_field_two
2
customer
LACSD
datetime
2018-09-21T00:55:02-07:00