Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 20, 2018, 08:17 AM
  • 30 0159_30 0158 _20112018_001807.mp4

Date
11/20/2018
W/O
735497
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00878
PipeID
P17864
Time
12:17 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6225
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
REDONDO BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_735497_TV30073_NOV2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
30 0158
Downstream MH
30 0159
Dir. of Survey
Upstream
Length Surveyed
107.6 ft.
Total Length
107.6 ft.
Structural Index
3
Structural Quick
3C00
Structural Rating
63
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
63
Pipe schematic from manhole 30 0158 to 30 0159
MH: 30 0158MH: 30 0159upstream0 ft. AMH - Upstream Manhole, Survey Ends - 30 01590.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish12.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"104 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start107.6 ft. MWM - Water Mark, 20 %of cross sectional area107.6 ft. MWL - Water Level, 5 %of cross sectional area107.6 ft. AMH - Downstream Manhole, Survey Begins - 30 0158

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWM
0MWL
3.6CM
107.6AMH30 0159
107.5CM
0AMH30 0158
95.5TF

Properties (4)

additional_info
SC365453
custom_field_two
3
customer
LACSD
datetime
2018-11-20T00:17:46-08:00