Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 3, 2018, 06:44 AM
  • 16 0148_B 1139_10022018_234438.mp4

Date
10/02/2018
W/O
729322
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00648
PipeID
P13180
Time
11:44 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6055
Sewer Name
16 ARROYO SECO TRUNK, SECTION 5
City
ALHAMBRA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_729322_TV16111_OCT2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
16 0148
Downstream MH
B 1139
Dir. of Survey
Downstream
Length Surveyed
323.6 ft.
Total Length
323.6 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
174
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
302
Pipe schematic from manhole 16 0148 to B 1139
MH: 16 0148MH: B 1139downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 01482 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start29.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"31.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start60.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"67.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"113.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"140.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"155.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"191.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"206.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"278.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"281.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"321.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish321.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish321.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE323.6 ft. AMH - Downstream Manhole, Survey Ends - B 1139

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    31.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    321.3 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (20)

DistanceCodeObservation
60.7TFA
67.9TFC
70.6TFC
29.4TFA
0MWM
321.3DAGS
0MWL
278.1TFC
155.7TF
206.6TF
2DAGS
323.6AMHB 1139
31.2CM
321.3CM
140.8TFC
281.2TF
113.8TFA
321.3MGOCOCKROACHES IN MANHOLE
191.7TFC
0AMH16 0148

Properties (4)

additional_info
SC365118
custom_field_two
3
customer
LACSD
datetime
2018-10-02T23:44:34-07:00