Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 7, 2018, 10:05 AM
  • 05 1353_05 1352 _07112018_020654.mp4

Date
11/07/2018
W/O
735012
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00444
PipeID
P20050
Time
2:05 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6212
Sewer Name
05 GARDENA PUMP TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_735012_TV05295_NOV2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1353
Downstream MH
05 1352
Dir. of Survey
Downstream
Length Surveyed
332.1 ft.
Total Length
332.1 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
198
O&M Index
2
O&M Quick
2E00
O&M Rating
58
Overall Index
3
Overall Quick
Overall Rating
256
Pipe schematic from manhole 05 1353 to 05 1352
MH: 05 1353MH: 05 1352downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 13530 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. MGO - General Observation - MAG COAT2 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start3.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"54.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"103.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"153.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"188.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start202.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"251.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"291.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"332.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish332.1 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish332.1 ft. AMH - Downstream Manhole, Survey Ends - 05 1352

Observation photos (2)

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  5 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    188.3 ft. - Deposits Settled Other, 5 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
0AMH05 1353
0MGOCONNECTION AT MH 9 O'CLOCK
103.2TFC
153.9TFC
202.4TF
332.1DSZ
251.3TFC
291.8TFC
2MGOMAG COAT
0MWM
0MWL
188.3DSZ
3.5TFC
54.7TFC
332.1SAV
2SAV
332.1AMH05 1352

Properties (4)

additional_info
SC365240
custom_field_two
3
customer
LACSD
datetime
2018-11-07T02:05:21-08:00